Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | coventry |
Date time: | 11.32am, Thursday 27th May, 2021 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Coventry |
Not properly signed, but there is a shared-use underpass to the left.
Comments reflect the views of the original submitter only.